翻訳と辞書
Words near each other
・ Martin of Dacia
・ Martin of Gerstmann
・ Martin of Laon
・ Martin of Leon
・ Martin of Littlebury
・ Martin of Opava
・ Martin of Pattishall
・ Martin of Soure
・ Martin of Tongres
・ Martin of Tours
・ Martin of Vertou
・ Martin Offiah
・ Martin Oglanby
・ Martin Ohm
・ Martin Olav Sabo
Martin Olav Sabo Bridge
・ Martin Olive
・ Martin Oliver
・ Martin Oliver (author)
・ Martin Oliver (captain)
・ Martin Oliver (Claddagh)
・ Martin Olley
・ Martin Olsen
・ Martin Olsen Nalum
・ Martin Olson
・ Martin Olsson
・ Martin Ondrejka
・ Martin Onslow Forster
・ Martin Op ’t Land
・ Martin Opic


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Martin Olav Sabo Bridge : ウィキペディア英語版
Martin Olav Sabo Bridge

The Martin Olav Sabo Bridge is a bridge in the city of Minneapolis and the first cable-stayed suspension bridge in the U.S. state of Minnesota. Formerly, the Midtown Greenway Pedestrian Bridge, it was renamed in honor of former Representative Martin Olav Sabo, a fourteen-term member of Congress from Minnesota.
Opened and dedicated in November 2007, the bridge crosses Hiawatha Avenue (Trunk Highway 55) north of 28th Street East and just south of 26th Street East, joining Phase 2 and Phase 3 of the Minneapolis Midtown Greenway at Hiawatha Avenue, allowing a continuous biking connection across the city. The bridge also links Longfellow community (Longfellow and Seward neighborhoods) to Phillips community (East Phillips neighborhood).
The bridge was built by Hennepin County and transferred to the City of Minneapolis, which owns and maintains the bridge.
The bridge was closed on February 20, 2012 when two of the cables that support the bridge fell due to cracks in their attachment points; additional significant cracks were subsequently found in two other support plates. The bridge, supported with temporary bracing, was reopened June 1, 2012. A summary report of the failure analysis released June 8, 2012 determined that unaccounted for wind-induced cable vibrations led to the failures of the attachment points. The bridge was again closed for repairs on September 23, 2012. Repairs were completed, and the bridge reopened, on November 19, 2012.
==Configuration==
The new bridge eliminates the need for bicyclists and pedestrians to cross busy Hiawatha Avenue with a stoplight at grade-level. Instead, the bridge brings them north one block, over the highway, and back south, introducing a new grade-level crossing of 28th Street East west of Hiawatha. Users are still able to use the at-grade Hiawatha crossing after completion.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Martin Olav Sabo Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.